Black Box ME262C Instrucciones de operaciones Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Section 5 - OPERATIONAL EQUIPMENT
HEATING AND VENTILATING
a. Heating of the cockpit is obtained by operation of the
control marked "Cabin Heat". (See fig. 1-11).
b. Ventilating is accomplished by opening a small air
scoop on the upper left of the fuselage just forward
of the canopy. The scoop is operated by means of a con-
trol lever. (See fig. 1-18.)
OXYGEN SYSTEM
a. This is a standard low pressure oxygen system with a
diluter demand oxygen pressure breathing regulator,
Type A-14.
b. Normal oxygen pressure (fig. 2-13) is 400 to 450 lb/sq in.
ARMAMENT
A. Not applicable.
COMMUNICATIONS EQUIPMENT
a. The airplane has a standard installation of an SCR-522
transmitter and receiver with a BC-602A control box.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28

Comentarios a estos manuales

Sin comentarios